Professional projects
RB | PROJECT DESCRIPTION | ORDERER | YEAR | AREA |
1 | Preliminary design of the building of the Faculty of Information Technology of the University "Džemal Bijedić" in Mostar. | "FIT" of the University "Džemal Bijedić" Mostar | 2019. | Building construction |
2 | Geomechanical study on geomechanical testing for the needs of construction of a business facility - Multipurpose Hall type 2 within the business zone on the Upper Colony locality Unis. | Municipality of Jablanica | 2019. | Civil engineering |
3 | Development of expert opinion on GPR and DI pipes | Vodovod i Kanalizacije doo Zenica | 2018. | Civil engineering |
4 | Retaining wall repair of the slope of the cut of the access road to Tekija in Blagaj. 2018. | City of Mostar | 2018. | Civil engineering |
5 | Study on engineering geological and hydrological and geotechnical characteristics of the soil for the G21 mission for the lighting project at the FC Velež stadium. | FK Velež | 2018. | Civil engineering |
6 | The main project for the protection of the scarp of the local road in the settlement of Lug in Jablanica. | Municipality of Jablanica | 2018. | Civil engineering |
7 | Study of protection of stem buildings from stone boulders in the settlement of Zlate. Investor Municipality of Jablanica. | Municipality of Jablanica | 2018. | Civil engineering |
8 | The main project of the porch at the entrance to the rectory of the University "Džemal Bijedić" in Mostar. | Municipality of Jablanica | 2018. | Civil engineering |
9 | Nostrification of the main project of the tunnel "Žaba", on the road M17.3 Buna-Neum, section Kiševo - Broćanac | JP Ceste FBiH doo Sarajevo | 2017 | Civil engineering |
10 | Preparation of an Elaborate on the assessment of the condition of the structure and on the determination of the existing condition of the structure and the walls of the Hotel Mostar | Neretva doo Visoko | 2017 | Civil engineering |
11 | Development of the Main project for the rehabilitation of retaining walls in the area of the HPP Jablanica | Public company Elektroprivreda BiH dd Sarajevo | 2016 | Civil engineering |
12 | Expertise on collected waters in the Neretva river basin | Public company Elektroprivreda BiH dd Sarajevo | 2016 | Civil engineering |
13 | Preparation of a Study for the cleaning of nanoparticles from the Neretva riverbed, at the localities "Polje Bijela", "Donje Polje" and "radava" in the municipality of Konjic | Municipality of Konjic | 2015 | Geophysics |
14 | Development of a program (project) of exploration works for geophysical testing of hips and pumpkins and stability checks of HPP Salakovac | Public company Elektroprivreda BiH dd Sarajevo | 2014 | Geophysics |
15 | Geophysical tests of hips and pumpkins, checking the stability of the dam and the cause of the crack in the "C" gallery of the dam of HPP Jablanica | Public company Elektroprivreda BiH dd Sarajevo | 2013 | Civil engineering |
16 | Completion of the main project for the reconstruction of the regional road R-148b Prozor-Konjic, section Kalovljakova luka - Solakova Kula | Ministry of Transport and Communications HNK Road Administration | 2013 | Civil engineering |
17 | Development of the Preliminary Design of WPP Podveležje | "ENERGY3" doo Mostar | 2013 | Building construction |
18 | Analysis, supplementation and correction of the bill of quantities for the section AC Drivuša-Klopče | JP "Autoceste FBiH" Mostar | 2013 | Civil engineering |
19 | Development of the completed project of access roads to the Bijela bridge in Konjic | Ministry of Transport and Communications HNK Road Administration | 2012 | Building construction |
20 | The main project of assembling the steel roof structure of the sports hall in Jablanica | "MIP" doo Mostar | 2012 | Building construction |
21 | Detailed design - reinforcement drawings of the front road passage "Zvirići" on the highway corridor Vc, section Zvirići - Počitelj | "MIP" doo Mostar | 2012 | Civil engineering |
22 | The main project for the rehabilitation of the Clock Tower in Donji Vakuf. Ground floor arrangement of the Clock Tower in Donji Vakuf | Municipality of Donji Vakuf | 2011 and 2012 | National Monument |
23 | Preliminary design of internal roads in the Campus of the University "Džemal Bijedić" in Mostar | BH Telecom | 2011. | Civil engineering |
24 | Preliminary and Main Project for the reconstruction of the "Bijela" bridge on the Regional Road R435 Konjic - Borci | Ministry of Transport and Communications HNK Road Administration | 2011. | Civil engineering |
25 | Detailed design for the rehabilitation of the "Bišćević House" in Mostar | Agency "Stari grad" Mostar | 2010. | National Monument |
26 | Detailed design of the upgrade of the building of the Faculty of Humanities in Mostar | Faculty of Humanities | 2010. | Building construction |
27 | Project for rehabilitation of girders at the distribution plant of HPP Salakovac and HPP Grabovica | Public company Elektroprivreda BiH dd Sarajevo | 2010. | Civil engineering |
28 | Landslide remediation projects "Sirana" and "Cerići" on Regional road R418b, Prozor - Konjic | Ministry of Transport and Communications HNK Road Administration | 2010. | Civil engineering |
29 | The main project for the rehabilitation of breakers at the overflows of HPP Grabovica | Public company Elektroprivreda BiH dd Sarajevo | 2010. | Civil engineering |
30 | Rehabilitation projects for 20 bridges on Regional Roads in HNK | Ministry of Transport and Communications HNK Road Administration | 2009. | Civil engineering |
31 | Plan for demolition and securing the construction pit for the reconstruction of the Hotel Neretva in Mostar | "Građevinar Fajić" doo Mostar | 2009. | Building construction |
32 | Detailed design for the rehabilitation of the Captain's Tower in Bihać | Institute for the Protection of Monuments USK Bihać | 2009. | National Monument |
33 | Detailed design of the torrent barrier "Trmošnik" | Public company Elektroprivreda BiH dd Sarajevo | 2008 | Civil engineering |
34 | The main project for the rehabilitation of the slope on the left bank of HPP Salakovac | Public company Elektroprivreda BiH dd Sarajevo | 2007 | Civil engineering |
35 | The main construction project of the building of the Faculty of Civil Engineering in Mostar | Faculty of Civil Engineering | 2007 | Building construction |
36 | Main design of the water supply tank of HPP Grabovica | Public company Elektroprivreda BiH dd Sarajevo | 2007 | Civil engineering |
37 | Preliminary and Main Design of bridges LOT 1 to LOT 5 on the regional road R418b, Prozor - Konjic | Bosnia and Herzegovina Federation of BiH HNK Municipality of Konjic | 2007 | Civil engineering |
38 | The main project of the entrance road to the campus of the University "Džemal Bijedić" in Mostar | Džemal Bijedić University | 2007 | Civil engineering |
39 | Preparation of the Study for the rehabilitation of the suspension bridge in Ostrošac, on the Regional Road R437 Ostrožac - Fojnica. | Ministry of Transport and Communications HNK Road Administration | 2006 | Civil engineering |
40 | Development of the Preliminary and Main Design of the Kragulja II Bridge on the Regional Road R437 Ostrožac - Fojnica. | Ministry of Transport and Communications HNK Road Administration | 2006 | Civil engineering |
41 | The main project for the rehabilitation of the landslide "Kalovljakova Luka" on the Regional Road R437 Ostrožac - Fojnica. | Ministry of Transport and Communications HNK Road Administration | 2006 | Civil engineering |
42 | Elaorate for determining the condition of the Neretva Hotel in Mostar | VGT Insurance | 2004. | Civil engineering |
43 | Nostrification of the Stara Ćuprija project in Konjic | Municipality of Konjic | 2003. | Civil engineering |
RB | PROJECT DESCRIPTION | ORDERER | YEAR | AREA |
1 | Revision of the Interpretation of the results of technical monitoring of the dam of HPP Snježnica Tuzla | JP EP BiH ED Tuzla | 2018. | Interpretation |
2 | Audit report on the Main Design of SS 110/35/20 kN Bosanski Petrovac. | PE EP BiH | 2018. | TS |
3 | Revision "Water supply systems for technical water for the settlements of Gubavica and Pijesci - water intake and pumping station, Main project. | City of Mostar | 2018. | Hydrology |
4 | Revision of the Main Project on the Vc section of the Buna-Počitelj section | GF University of Mostar and GIC doo Mostar | 2016 | Civil engineering |
5 | Revision of the Study - assessment of technical feasibility of bringing the middle discharge on the dam of HPP Jablanica into operational functional condition with the analysis of evacuation of water from the accumulation of HPP Jablanica for the case when the middle discharge is in operational functional condition… | Public company Elektroprivreda BiH dd Sarajevo | 2016 | Hydrology |
6 | Revision of the Main Project Corridor Vc, section Počitelj-Bijača | JP "Autoceste FBiH" Mostar | 2014 | Civil engineering |
7 | Revision of the Main Project "Wastewater Treatment Plant (5000 eq) - Drecelj" in Konjic | Municipality of Konjci | 2014 | Hydrology |
8 | Revision of the Investment and Technical Documentation of the Preliminary Design of HPP Janjići | Zavod za vodoprivredu dd Sarajevo | 2014 | Hydrology |
9 | Revision of the Kalovljak landslide remediation project on the regional road R-437 Ostrožac Fojnica | Ministry of Transport and Communications HNK Road Administration | 2013 | Civil engineering |
10 | Revision of the main project for the rehabilitation of the regional road R-435 Konjic-Borci, section Most Bijela Borci | Ministry of Transport and Communications HNK Road Administration | 2013 | Civil engineering |
11 | Revision of the project documentation for the removal and / or stabilization of the "remains" above the HPP Grabovica dam | Public company Elektroprivreda BiH dd Sarajevo | 2013 | Civil engineering |
12 | Revision of the main execution project of the above-ground part of the hall of the Cultural and Sports Center Mostar (Phase II) | City of Mostar | 2012 | Building construction |
13 | Revision of project documentation for LOT 3 of the Sarajevo Bypass | JP "Autoceste FBiH" Mostar | 2012 | Civil engineering |
14 | Revision of the main project for the reconstruction of the building of the former IV primary school in Mostar | "AAA Group" doo Mostar | 2012 | Civil engineering |
15 | Revision of the Main Revitalization Project of the Bear Tower in Jajce | Commission to Preserve National Monuments of BiH | 2012 | Building construction |
16 | Revision of the Main Project Corridor Vc, section Tarčin-Konjic | JP "Autoceste FBiH" Mostar | 2012 | Civil engineering |
17 | Revision of the Preliminary and Main Design for the Rehabilitation of Leakage through the Dam Body of HPP Grabovica and HPP Salakovac | Public company Elektroprivreda BiH dd Sarajevo | 2011. | Civil engineering |
18 | Revision of the Main Project of Geological Research and Landslide Rehabilitation on the Regional Road R437 Ostrožac - Fojnica and the Main Project of Landslide Rehabilitation on the Regional Road R436 | Ministry of Transport and Communications HNK Road Administration | 2011. | Civil engineering |
19 | Revision of the main projects: 1. Geological research on reg. Road R-436, Ostrožac - Fojnica. 2. Road R-436, Borci - Kalinovik. 3. Sanction of landslides Sirana and Cerići in reg. Road R-438b, Prozor - Konjic | Ministry of Transport and Communications HNK Road Administration | 2010. | Civil engineering |
20 | Revision of the main water supply project of the settlement Gubavica Pijesci. | City of Mostar | 2010. | Water supply |
21 | Revision of the Main Project for the reconstruction and upgrade of the building of the Faculty of Mechanical Engineering in Mostar | Faculty of Mechanical Engineering | 2010. | Building construction |
22 | Revision of the Preliminary and Main Design of the road bridge over the Neretva River on the bypass around Unis in Konjic | Municipality of Konjic | 2010. | Civil engineering |
23 | Revision of the Preliminary and Main Design of the pedestrian bridge over the river Trešanica in Konjic | Municipality of Konjic | 2010. | Civil engineering |
24 | Revision of the Main Bypass Project on the Regional Road R418 Prozor - Mokronoge | Ministry of Transport and Communications HNK Road Administration | 2009. | Civil engineering |
25 | Revision of the Main Reconstruction Project of the Regional Road R426 Dračevo - Zavala | Ministry of Transport and Communications HNK Road Administration | 2009. | Civil engineering |
26 | Revision of the Main Reconstruction Project of the Regional Road R435a Ćesim - Rujište - Potoci | Ministry of Transport and Communications HNK Road Administration | 2009. | Civil engineering |
27 | Revision of the Main Design of the Bakšim Bridge over the Radobolja River in Mostar | City of Mostar | 2008 | Civil engineering |
28 | Revision and nostrification of the Main Project for the reconstruction of the Old Bridge in Konjic | Municipality of Konjic | 2008 | Civil engineering |
29 | Revision of the Preliminary and Main Reconstruction Project of the Regional Road R418-b, Section Milaševica - Herska krivina. | Ministry of Transport and Communications HNK Road Administration | 2007 | Civil engineering |
30 | Revision of the Main Project for the Expansion of the Road Tunnel in Konjic | Municipality of Konjic | 2007 | Civil engineering |
31 | Revision of the Main Project of the Regional Road R418b Prozor - Buturović Polje - Konjic section Lisičići - Nevizdraci | Municipality of Konjic | 2006 | Civil engineering |
32 | Revision of the Main Reconstruction Project of the Regional Road R437 Ostrožac - Fojnica, section Kragulja - Ljeskovik | Ministry of Transport and Communications HNK Road Administration | 2006 | Civil engineering |
33 | Revision of the Main Project of the city bridge over the river Neretva in Konjic | Municipality of Konjic | 2006 | Civil engineering |
34 | Additional design and revision of the Main Project for the construction of the Regional Road R - 437, Ostrožac - Fojnica | Ministry of Transport and Communications HNK Road Administration | 2005. | Civil engineering |
35 | Revision of the Main Landslide Rehabilitation Project on the Regional Road R437 Ostrožac - Dusina at the Košpina Luka site | Ministry of Transport and Communications HNK Road Administration | 2005. | Civil engineering |
36 | Revision of the Main Landslide Rehabilitation Project on the Regional Road R437 Ostrožac - Dusina at the Bilišine site | Ministry of Transport and Communications HNK Road Administration | 2005. | Civil engineering |
37 | Revision of the Main Landslide Rehabilitation Project on the Regional Road R436 Borci - Kalinovik, at the Lađanica site | Ministry of Transport and Communications HNK Road Administration | 2005. | Civil engineering |
RB | PROJECT DESCRIPTION | ORDERER | YEAR | AREA |
1 | Regular laboratory testing of concrete and components for most contractors and concrete workers in the HNK | HNK | 2019. | Laboratory testing |
2 | Testing with a test load of the "Treševina" viaduct on Corridor Vc of the Vlakovo-Tarčin section. | "ŽGP" | 2014 | Civil engineering |
3 | Testing with a test load of the "Bojnik" viaduct on Corridor Vc of the Vlakovo-Tarčin section. | "ŽGP" | 2014 | Civil engineering |
4 | Test load test of the M2 bridge on Corridor Vc of the Drivuša-Kakanj section | Hidrogradnja dd Sarajevo | 2013 | Civil engineering |
5 | Testing with test load of "Reljevo" overpass on Sarajevo bypass - LOT 1. | "HP Investing" Mostar | 2012 | Civil engineering |
6 | Test load of the "Konak" bridge on the main road M17 - Mostar bypass | "HP Investing" Mostar | 2011. | Civil engineering |
7 | Preliminary and control examinations of stone, mortar and components for the reconstruction of the Cathedral Orthodox Church in Mostar | "Gemax" doo Belgrade | 2010. | Laboratory testing |
8 | Testing of geomechanical characteristics of soil and preparation of Geomechanical study and Geotechnical design for the bridge "Bijela" on the Regional road R435, Konjic - Borci | Ministry of Transport and Communications HNK Road Administration | 2010. | Geomechanics |
9 | Testing of geomechanical characteristics of soil and preparation of geomechanical study for landslide "Kukovi" and testing of landslide stability as part of technical monitoring. | Public company Elektroprivreda BiH dd Sarajevo | 2010. | Geomechanics |
10 | Examination of geomechanical characteristics of the soil and preparation of geomechanical studies for approximately 30 residential and commercial buildings in the area of Mostar. | - | 2004-2010 | Geomechanics |
11 | Examination of geomechanical characteristics of the soil and preparation of a geomechanical study for the facility of the Obstetrics and Gynecology Department with pediatrics RMC Dr. Safet Mujić in Mostar | RMC Dr. Safet Mujić in Mostar | 2009. | Geomechanics |
12 | Test load of the bridge LOT 5, on the Regional Road R418b, Prozor Konjic | "GPI" doo Konjic | 2009. | Civil engineering |
13 | Test load of the LOT 3 bridge, on the Regional Road R418b, Prozor Konjic | "GPI" doo Konjic | 2009. | Civil engineering |
14 | Test load of the bridge in Čelebići on the main road M17, Mostar - Sarajevo. | "HP Investing" Mostar | 2009. | Civil engineering |
15 | Test load of bridge no. 1 on the Regional Road R445, Visoko - Kakanj | "HP Investing" Mostar | 2009. | Civil engineering |
16 | Testing of geomechanical characteristics of soil and preparation of geomechanical study for bridges LOT3, 4 and 5 on Regional road R418b, section Lisičići - Nevizdraci | "GPI" doo Konjic | 2008 | Geomechanics |
17 | Testing the quality of concrete in the stands of the stadium in Konjic | Municipality of Konjic | 2008 | Civil engineering |
18 | Testing of geomechanical characteristics of the soil and preparation of a geomechanical study for the stands of the stadium in Konjic | Municipality of Konjic | 2008 | Geomechanics |
19 | Test by test load of the footbridge on the Highway Zenica - Sarajevo | "HP Investing" Mostar | 2008 | Civil engineering |
20 | Control laboratory testing of components, injection mixtures during the repair of the injection curtain and the screen of the HPP Rama dam | Geosonda doo Zenica | 2006 | Laboratory testing |
21 | Test by test load of the road bridge on the Regional road R-437, in Košpina luka | "HP Investing" Mostar | 2006 | Civil engineering |
22 | Control laboratory testing of components, injection mixtures and shotcrete during the rehabilitation of the tunnel "Crnaja" on the main road M17 | Geosonda doo Zenica | 2006 | Civil engineering |
23 | Testing of injection masses and shotcrete at the location "Marina Pećina" | Geosonda doo Zenica | 2006 | Civil engineering |
24 | Test load test of the road bridge on the regional road R437, section Parsovići - Kragulja km 8 + 360 | "HP Investing" Mostar | 2005. | Civil engineering |
25 | Examination of the "Port" bridge in Mostar | Hidrogradnja dd Sarajevo | 2005. | Civil engineering |
26 | Testing of geomechanical characteristics of soil and preparation of geomechanical study for BH Telecom facility in Mostar | BH Telecom | 2001 | Geomechanics |
27 | Test load of the road bridge "Musala" in Mostar. | Hidrogradnja dd Sarajevo | 2001 | Civil engineering |
28 | Test load of the pedestrian bridge at the location of the Old Bridge in Mostar. | Directorate for Reconstruction of the City of Mostar | 2000 | Civil engineering |
29 | Test load of the pedestrian bridge "Bunur" in Mostar, L = 80m. | Directorate for Reconstruction of the City of Mostar | 1998. | Civil engineering |
RB | PROJECT DESCRIPTION | ORDERER | YEAR | AREA |
1 | Supervision of the construction of Sheikh Jujino Turba in Mostar | Commission to Preserve National Monuments of BiH | 2015 | Civil engineering |
2 | External quality control on the Corridor Vc Motorway, Vlakovo-Tarčin section | JP Autoceste FBiH | 2014 | Civil engineering |
3 | Supervision of interior works on the new madrasa building in the North Camp | From Bosnia and Herzegovina | 2013 | Building construction |
4 | Supervision of the roof reconstruction works on the Orthodox Church of St. Vasilije Ostroški in Blagaj | Commission to Preserve National Monuments of BiH | 2012 | Building construction |
5 | Professional supervision over injection works to prevent water leakage through the dams of HPP Salakovac and HPP Grabovica | JP Elektroprivreda BiH dd Sarajevo | 2012 | Civil engineering |
6 | Supervision over the execution of works on the construction of the Mazoljica II drinking water reservoir in Mostar | City of Mostar | 2010. | Civil engineering |
7 | Supervision over the execution of works on the reconstruction of the regional road Prozor-Konjic R418b | Ministry of Transport and Communications HNK Road Administration | 2010. | Civil engineering |
8 | Supervision over the construction of water exploration wells on the plateau of Podveležje | City of Mostar | 2010. | Hydrogeology |
9 | Supervision over the construction of 3 residential and business buildings "Valley of the Sun" in Mostar | Velbos, doo Zepce | 2010. | Building construction |
10 | Supervision over the execution of works on the reconstruction and upgrade of the building of the Faculty of Mechanical Engineering in Mostar | Faculty of Mechanical Engineering | 2010. | Building construction |
11 | Supervision over the execution of conservation works of the first phase on the current maintenance of the medieval town - Fortress Stjepan grad in Blagaj | Agency "Stari grad" Mostar | 2010. | National monuments |
12 | Supervision over the execution of works on the rehabilitation of the regional road R424 Mostar - Čitluk | Ministry of Transport and Communications HNK Road Administration | 2009. | Civil engineering |
13 | Supervision over the execution of works on the reconstruction of the building of the Hotel "Neretva" in Mostar | VGT Insurance | 2009. | Building construction |
14 | Supervision over the execution of works at the Hospital in Konjic | "Tika" Turkish Agency for International Cooperation and Development | 2009. | Building construction |
15 | Supervision over the execution of works on the rehabilitation of the mosque "Ali - beg Kapetanović" in Vitina near Ljubuški | Commission to Preserve National Monuments of BiH | 2009. | National monuments |
16 | Supervision of reconstruction The old bridge in Konjic | Bosnia and Herzegovina Federation of BiH HNK Municipality of Konjic | 2008 | National monuments |
17 | Supervision over the execution of works on the reconstruction of the building of the Faculty of Civil Engineering in Mostar | Faculty of Civil Engineering | 2008 | Building construction |
18 | Supervision over the construction of the building of the Faculty of Law in Mostar | Faculty of Law Mostar | 2007 | Building construction |
19 | Supervision over the reconstruction of the Regional Road R - 437 Ostrožac - Fojnica | Ministry of Transport and Communications HNK Road Administration | 2006 | Civil engineering |
RB | PROJECT NAME | ORDERER | YEAR | AREA |
1 | Interpretation of the results of technical monitoring of HPP dams on the Neretva from 2006 to 2017 | Public company Elektroprivreda BiH dd Sarajevo | 2008, 2009, 2010, 2011, 2012, 2013, 2014, 2015, 2016, 2017 and 2018 | Interpretation of monitoring results |
2 | Geodetic landslide monitoring Hips for needs Branches of "HPP on the Neretva" Jablanica | Public company Elektroprivreda BiH dd Sarajevo | 2015 | Interpretation of monitoring results |
3 | Control of sediment measurements in the accumulation basin of HPP Salakovac and HPP Jablanica | Public company Elektroprivreda BiH dd Sarajevo | 2013 and 2015 | Monitoring |
4 | Technical monitoring of the "Kukovi" landslide | Public company Elektroprivreda BiH dd Sarajevo | 2010. | Monitoring and interpretation of monitoring results |
5 | Examination of the condition of bridges on all regional roads in the Herzegovina - Neretva Canton | Ministry of Transport and Communications of the Croatian National Theater Mostar | 2009. | Monitoring |
6 | Geodetic survey of dams of HPP Jablanica, HPP Grabovica and HPP Salakovac from 2008 to 2010 | Public company Elektroprivreda BiH dd Sarajevo | 2008, 2009 and 2010 | Geodetic works |
7 | Investigative works on the Mehmed Pasha Sokolovic Bridge in Visegrad | "TIKA" Turkish Agency for International Cooperation and Development | 2008 | Exploration works, national monuments |
8 | Investigative works on the Old Bridge in Konjic | Bosnia and Herzegovina Federation of BiH HNK Municipality of Konjic | 2004. | Exploration works, national monuments |
Phone: 036 514 850
Phone: 036 514 874
Email: gf@unmo.ba
Bank account: 1610200000290419
Find out about enrollment options
Join us
The Faculty of Civil Engineering in Mostar offers the possibility of enrollment in two directions of the first cycle and two directions of the second cycle of studies